I need a solution
Is there a way to configure a Start Date for an Incremenal job? In BE 2010 I was able to configure this easily. However, in BE 2015 I can only find the option to create a start date for a Full Backup. Am I missing something here?
Any help help would be much appreciated.
Thanks in advance!