I need a solution
Hi,
- 7 tapes for 7 daily backup
- 7 media sets (1 wk overwrite protection period / infinite - allow append)
- 7 jobs per everyday (append to media, overwrite if no appendable media is available)
-----------------------
If the tape full, alert "Please insert overwrite media into ....." is shown.
For my settings upper, I want every tape available to overwrite (old data is not important) while it was fulled / not enough space to backup.
- Is it possible ? Since I need to erase the tape everyime ....
Thanks !