I need a solution
I have a job in which I have 5 VMs selected for backup. If the 1st VM backup fails for some reason, does it continue with backing up the remaining VMs or does the whole job fail.?
Also is there a way I can multistream the VM backups instead of it running sequentially.
Thanks