I need a solution
Hi,
yesterday we configured the backup for our first SAP HANA applicance.
This was ok so far, we managed to do full and log backups.
The problem is:
How do I do full backups to tape, but log backups to disk?
There is the file initSAP.utl, but in there, I can only specify 1 policy and/or 1 schedule, so full and log backups go to the same schedule.
How do I send logs to a different Policy/ schedule than ful backups?
Thanks!
Volker